Project
Modern logistics hub
Industrial warehouse with steel structures, mezzanine and fire-rated installations.
Scope
- Steel structures and mezzanine decks
- Concrete foundations and slabs
- Fire protection and fire stopping
- Coordination with logistics and MEP trades
Project data
Period: 2024
Location: Southern Denmark
Service: Industrial building
Focus: Fire, logistics, QA
Method
Delivery plan
- 3D coordination and clash control
- Phasing aligned with MEP and operations
- Daily safety meetings and lift plans
Result
Delivered as planned with full QA documentation. The client received an operation-ready logistics centre with safe fire and access control.